
Case 01 - commercial
Aerial Street Resurface
Residential Street - Los Angeles
- Challenge
- An aging neighborhood street with surface fatigue, raveling, and water pooling along the curb line.
- Scope
- City coordination, traffic control, full-width hot-mix overlay with paver, breakdown roller and finish roller working in sequence.
- Outcome
- Smooth, uniform surface delivered in a single day with full neighborhood access restored by evening.










